Gogoal Hydro

Mussoorie Power House Gets a New Lease on Life: GoGoal’s Expertise Shines

Introduction

We were thrilled to announce that GoGoal Hydro Pvt. Ltd. completed the Renovation, Modernization, and Upgrading (RMU) works for one of the oldest powerhouses in India, located in Mussoorie, Uttarakhand. This iconic powerhouse, which dates back to the early 1910s, played a vital role in providing electricity to almost the entire Mussoorie region.

powerhouse

Design and Procurement of Turbine Equipment Highlights

Forged Runner: Procured from Europe to ensure high efficiency and reliability.

Redesigned hydro turbine set based on European design, incorporating cutting-edge technology.

– Manufacturing works of all turbine components was carried out in the workshop of GoGoal

Project Highlights:

Customer: UJVN Limited

Scope: Design, Engineering, Manufacturing, Supply, Erection, Testing, and Commissioning of a new hydro generating set for the existing powerhouse.

Number of Units: 1

Turbine Type: Pelton

Turbine Diameter: 0.9 m

Capacity: 0.5 MW

Commissioning Year: 2018

Machine Speed: 1000 rpm

Head: 305 m

Discharge: 0.22 cumecs/unit

Inner-power-house

Key Replacement Highlights:

As part of the RMU works, all major components like the turbine, generator, Control room components, and Switchyard components related to this unit were replaced with new ones, while maintaining the existing design parameters. This comprehensive replacement ensured optimal performance, efficiency, and reliability.

Challenges Overcome

  1. Overcoming Infrastructure Challenges: Establishing a Temporary Approach Road The most significant hurdle was the absence of an approach road to the powerhouse. We established a temporary road, ensuring the safe transportation of equipment and personnel.
  1. Addressing Local Concerns: We faced resistance from local communities, which required sensitive handling and effective communication to resolve.
  2. Upgrading outdated infrastructure while maintaining the existing power house’s structural integrity.
  3. Ensuring seamless integration with the existing transmission system.
  4. Meeting stringent safety and environmental regulations.

GoGoal’s Expertise Shines:

Our team of experienced engineers and technicians demonstrated exceptional expertise in:

– Designing and manufacturing a customized hydro-generating set.

– Executing complex erection and commissioning tasks.

– Ensuring efficient project management and timely completion.

Benefits of the Project:

The successful completion of this RMU project:

– Enhanced the power house’s efficiency and reliability.

– Increased power generation capacity.

– Reduced maintenance costs.

– Contributed to the growth of the regional economy.

– Increased the life of this machine by 30 years.

A Testament to GoGoal’s Commitment:

This achievement reinforced GoGoal Hydro Pvt. Ltd.’s commitment to delivering high-quality, innovative solutions for the hydropower sector. We took pride in our ability to revitalize aging infrastructure, ensuring a sustainable and reliable energy supply for communities.

About GoGoal Hydro Private Ltd.:

GoGoal Hydro Private Ltd. is a leading provider of hydroelectric power solutions, specializing in the renovation, modernization, and upgradation of existing power plants. Our team of experts delivers tailored solutions to meet the unique needs of our clients, ensuring efficient, reliable, and sustainable energy generation.

Contact Us:

To learn more about our services and expertise, please contact us at commercial@gogoalhydro.com

Join the Conversation:

Share your thoughts on this project and the importance of RMU in the hydropower sector. Follow us on social media

LINKEDIN (https://www.linkedin.com/company/31447473/admin/dashboard/) to stay updated on our latest projects and achievements.

Leave a Comment